Materials and finish
How to Approve PU Handbag Material Swatches
Review the surface, backing, feel and colour of a PU handbag material with a documented swatch approval instead of relying on a screen image.
By SHIREBAGPublished: 2 min read
PU describes a material family, not one fixed appearance or performance level. Two samples with similar grain can differ in backing, thickness and handling. Treat the swatch as a component that must work with the bag's structure, rather than approving colour alone.

In this guide
Identify the complete material
Ask for the supplier's material code, stated composition, backing and thickness information. Label the physical swatch so it can be matched to the quotation. Do not infer composition or recycled content from appearance. If the supplier proposes an alternative, give it a separate reference and review it before accepting it as equivalent.
Review it in the intended construction
A flat swatch may look attractive but behave differently when folded, stitched or reinforced. Ask to see the chosen material on a relevant sample, including seams and edges. Explain whether the bag should be soft or structured. The feel of the finished product also depends on lining and reinforcement, so a swatch alone cannot determine the final result.
Use a physical colour reference
Keep an approved labelled swatch and agree how future material will be compared with it. Review colour under consistent lighting and note the finish as well as the shade. A photograph, colour name or screen code can help communication, but should not silently replace the agreed physical reference when close colour matching matters.
Define evidence for performance claims
If durability, colour transfer or another property is important, state the intended use and ask which test evidence is available for the exact material. Check the report's sample identity and scope. Do not turn a general supplier statement into a guaranteed lifespan or a certified claim, and do not assume that another material's report covers yours.
Record approval and substitutions
Write down the approved code, colour, finish and date, together with any outstanding checks. Ask the supplier to seek approval before substitutions. Keep the material record with the sample and quote. For existing stock, use this process to ask about the supplied material; the stock offer does not include replacing it with a newly selected PU.

